Fukushima Iwaki Biomass Power Plant flow chart

Steam turbine

Carbon neutral

The Fukushima Iwaki Biomass Power Plant aims to contribute to society and the local community by supplying sustainable energy. A biomass power plant working with the community — Making Fukushima a pioneer in renewable energy

  • Electrical
  • Area Yoshima
  • Industrial ParksIwaki-yoshima Industrial Park

ABLE ENERGY Limited Liability Company Fukushima Iwaki Biomass Power Plant

Products & Services

  • Other

Related Fields

  • Energy / Environmental Recycling

Company Overview

Able Energy Limited Liability Company was founded in February 2015 with investments from Able Corporation, which handles power plant maintenance, and development, construction, and maintenance of renewable energy in Fukushima Prefecture, as well as Kansai Electric Power Co., Inc., and Kyudenko Corporation.
In January 2020, we began construction on the 5.4 ha Fukushima Iwaki Biomass Power Plant at the Yoshima Industrial Park, and the facilities began operation on April 1st, 2022.
We operate a wood biomass power plant with a max output of 112,000 kW.

Primary Products / Services

● Operation & maintenance of biomass power plant facilities
● Supply and sale of electricity

Company Strengths & Characteristics

As of April 2022, we run one of the largest wood biomass power plants in Japan, generating approximately 770 million kWh annually (equivalent to the annual electricity consumption of about 250,000 households*1)
and supply power to the Tohoku region.
Our plant generates electricity using plant-based biomass in the form of wood pellets sourced from overseas. Only certified, legal, and sustainable wood and wood products are used, resulting in an annual
reduction of approximately 333,000 tons*2 of CO2.
*1 Calculation based on average consumption model for Tohoku Electric Power’s Residential Electric Meter Plan B service (260 kWh per month)
*2 Calculated using the national average CO2 emission coefficient for
fiscal 2020 (0.433 kg-CO2/kWh)

Future Prospects & Areas of Interest

The soot generated during the operation of the power plant is currently treated as industrial waste, but we aim to work towards its reuse as a valuable resource in the future.

Company information

ABLE ENERGY Limited Liability Company Fukushima Iwaki Biomass Power Plant

  • Address

    〒970-1144 
    24-6 Iwaki City Yoshima Industrial Park, Fukushima

  • TEL

    0246-88-6773

  • FAX

    0246-88-6774

  • E-mail

    info@able-energy.jp

  • URL

    https://able-energy.jp

  • Representative

    Yukihide Sato, Executive Operations Officer

  • Established

    February, 2015

  • Capital

    1 (million yen)

  • Employees

    23

  • Contact

    Masamoto Watanabe, Vice President  
    E-Mail:watanabe.masamoto@able-energy.jp

Copyright ©︎2024 IWAKI MANUFACTURING COMPANY ARCHIVE All Rights Reserved.